Steel awning frames mounted over windows on a new build
TG Welding / Production builders3850 N. Highway 183 · Liberty Hill, TX

Same steel, every lot, every time

TG Welding builds repeat steel for production, townhome and multifamily builders around Liberty Hill and Central Texas. We make columns, stair and porch rail, awning frames, mailbox enclosures and fence to your plan set, in runs of one or a thousand. Once you approve the quote, we confirm the schedule in writing, and our crew sets the steel on site.

DaysWritten quotes, not weeks
$2MGeneral liability, COI on request
Shop + fieldBuilt in our bay, set on your site
5.0Rated · verified reviews

001 The problem

Repeat plans need repeat steel

  • 01

    Parts that don't match

    Lot 12's rail fits and lot 13's doesn't. Small differences turn into field fixes across a whole phase.

  • 02

    Starts outrun the sub

    A small shop can keep up with one house. It falls behind when you release a phase of starts.

  • 03

    A new quote every lot

    Chasing a fresh quote for every lot slows your purchasing team and clutters the job file.

003 How it works

Drawings in. Steel out.

Four steps, all in writing, so your team always knows what is being built and when it lands.

  1. Send the plan setSend each plan's drawings with the steel marked and your lot counts.
  2. Quote per planYou get a written quote per plan in days, ready for purchasing to reuse.
  3. Approve the quoteOnce you approve the quote, we confirm the schedule in writing for that run.
  4. Build and setWe build the run in Liberty Hill and our crew sets it lot by lot.

004 From our jobs

Shot on our floor and our sites

Real TG Welding work. No stock photos.

  • Two welders fitting pipe frames on stands
    Two welders fitting pipe frames on stands
  • Crew welding a row of steel frames in the shop
    Crew welding a row of steel frames in the shop
  • CNC plasma table cutting plate parts
    CNC plasma table cutting plate parts
  • Stack of welded steel frames ready to finish
    Stack of welded steel frames ready to finish
  • Steel mailbox enclosure fresh off the table
    Steel mailbox enclosure fresh off the table
  • Steel awning frames set over windows on a new build
    Steel awning frames set over windows on a new build
  • Front porch rail and stair rails on farmhouse
    Front porch rail and stair rails on farmhouse
  • Steel columns with welded base and cap plates
    Steel columns with welded base and cap plates

See all completed jobs

005 Why TG Welding

Why production builders run steel through us

Quality work, finished on time and on budget. Exactly what they said they would do.

Verified TG Welding review
Built for volume
Production runs welcome, one part or a thousand. A CNC plasma table and staging racks keep parts consistent.
Shop and field
We build the parts and set them, so the fit in the field matches the shop.
Ready for vendor setup
$2M general liability, COI on request, ACH or check, and a one-sheet packet for setup.

006 Vendor setup

Set us up as a vendor in one sheet

The contractor packet has what your AP team needs. Questions go to accounting@tgweldingatx.com.

Download the contractor packet

Legal name
TG Welding LLC
Insurance
$2M general liability
Payment
ACH or check
Quotes
In writing, in days

007 FAQ

Straight answers for production builders

Can you build the same rail for every house in a phase?

Yes. We build to each plan's drawings and repeat it across the run, so every lot gets the same parts. Production runs welcome, one part or a thousand. Our crew sets the rail on site, which keeps the field fit consistent too.

How do quotes work across multiple plans?

Send the drawings for each plan with the steel scope marked and your expected lot counts. You'll get a written quote in days, not weeks or months, broken out by plan. You can approve the quote per phase or per lot, whichever your system uses.

Do you handle townhome and multifamily work?

Yes. Stair and porch rail, columns, awning frames, enclosures and site fence all fit the same production approach. We build to the drawings you supply and set the steel on site with our own crew. Send the plan set and we'll quote it in writing.

What do you need to set us up as a vendor?

Our one-sheet contractor packet covers vendor setup and lives on this page. We carry $2M general liability and send a COI on request. Payment is by ACH or check, and AP questions go to accounting@tgweldingatx.com. Your office gets what it needs to set us up as a vendor without chasing us.

Releasing a new phase?

Send the plan set to tim@tgweldingatx.com for a written quote in days.